Capturing Process Line Set Up Timings
Starting Set /Up Checking
All production lines begin with a set-up/check-up phase and as such
you can see that the Setup status light is red.

The setup time needs to be captured, so: -
- Click the start icon as you begin setting up the
job on the machine.

- The following happens: -
- The setup status light updates to Amber
- I the background, the duration timer counter for the set-up
phase begins

Completing Set /Up Checking
When you have completed setting up the job, and have undertaken all
the necessary sign off checks to begin the job, you need to record
that you have signed it off and production phase can begin.
To do this:-
- Click
the start
icon again

- You must now record who has setup and signed off the
job

- Find your name in the drop-down
list (this contains the names of individuals who have authority to
sign off jobs as checked) and click select

Note:
Be mindful that the name recorded against the line is confirming their
responsibility that the job has been set up correctly and signed
off as such. You should not therefore select a name of someone who
has not done this!
The
production
stage of the process starts