When enough split frames have been accumulated in the splits pool to warrant re-stretching they must be sent/collected by the supplier that undertakes this work.
BLANK FRAMES can be sent/collected before a decision is made on what mesh counts are required for restretch. This can be done when the corresponding P/O is raised. The important thing is to account for the blank frames that have been sent.
Note: Before you raise the order - you need to ensure that the split frames have been recorded as collected. This is outlined in detail in Tracking Collected Frames
Open Screens Control List
Select
the Frame and Mesh Count that
you will be receiving back from the Screen
Repairers.
Choose New PO From Selected
This will open the PO form layout with this selection automatically input.
Enter the Supplier and Contact (example pyramid/ dean smith)
Enter Internal Contact
In the PO Lines section,
ensure you select
Re-stretch in the
Type field
Enter the Quantity
Ordered (example 10) and Unit
Cost for the re-stretch product (example £ 15)
Once the order is sent to the supplier - the PO order status
updates from Red > Purple
(Sent) - and the QTY ordered is added to the Expected Total
The expected qty is reduced by the QTY booked in
The available qty is increased by the same QTY
And in the Splits Pool, Collected QTY for the frame is debited by the QTY received